25 turbines · operational · Strathclyde
| Status | Operational |
|---|---|
| County / region | Strathclyde |
| Turbines | 25 |
| Installed capacity | 50 MW |
| Turbine capacity | 2 MW |
| Tip height | 120 m |
| Operator (or applicant) | InfraRed Capital Partners/ E.on |
| Turbine manufacturer | Vestas |
| Turbine model | V136-4.5 |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 14 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4262.
The application was determined in about 119 months. Construction to first power took about 18 months. A planning permission on this site expired in October 2000. The scheme has been operating for about 8 years. That works out at 2 MW per turbine on average.