Aikengall IIa Community Wind Farm
Borders

Recorded in WhichWindTurbine: 19 wind turbines in operation. Point the app at one of them to see its profile in real time.

19
turbines
81.7 MW
MW total
4.3 MW
per turbine
145 m
tip height

📍 19 turbines mapped — each dot is a turbine recorded in the database. Average position: 55.894 N · 2.44989 W.

Aikengall IIa Community Wind Farm

19 turbines · operational · Borders

Wind farm facts

StatusOperational
County / regionBorders
Turbines19
Installed capacity81.7 MW
Turbine capacity4.3 MW
Tip height145 m
Operator (or applicant)Community Windpower
Turbine manufacturerSiemens Gamesa
Turbine modelSWT-DD-120
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

✓ Verified reference — turbine make and model

Siemens Gamesa · SWT-DD-120 · 19 turbines · 4.3 MW each · rotor 120 m

Source: reNews, wind farm commissioning, 2021-12, read on 2026-09-14. Corroborated by 3 further sources. Where OpenStreetMap tags differ, this record prevails.

✓ Independently confirmed on 2026-09-19 by Wikipedia, list of onshore wind farms in the United Kingdom (secondary source, compiled from UKWED): 19 Siemens Gamesa SWT-DD-120 (4.3 MW), 2021.

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20442014201620182020202220242026today12345
  1. 1Feb 2014 — Application submitted
  2. 2Oct 2016 — Permission granted
  3. 3Oct 2016 — Granted on appeal
  4. 4Jan 2021 — Under construction
  5. 5Nov 2021 — Operational

The register also records a planning permission expiry in Oct 2011, in the same month as, or before, the permission was granted: it refers to an earlier permission, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 7 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4591.

What the register tells us

The application was determined in about 32 months. Construction to first power took about 10 months. Permission was ultimately granted on appeal in October 2016. A planning permission on this site expired in October 2011. The scheme has been operating for about 5 years. That works out at 4.3 MW per turbine on average.

Nearby

See all wind farms in Borders.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.