Recorded in WhichWindTurbine: 9 wind turbines. Point the app at one of them to see its profile in real time.
📍 3 turbines mapped — each dot is a turbine recorded in the database. Average position: 52.23094 N · 0.60422 W.
9 turbines · revised · Bedfordshire
| Status | Revised |
|---|---|
| County / region | Bedfordshire |
| Turbines | 9 |
| Installed capacity | 20.7 MW |
| Turbine capacity | 2 MW |
| Tip height | not recorded |
| Operator (or applicant) | Nuon Renewables |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
DevelopmentConstructionOperationAhead (repowering horizon at 22 years)
The register links a second scheme on this site (REPD ref 4116, Operational): 3 turbines · 2 MW each · applicant Airvolution Energy. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2945.
The register records a refusal in July 2007 before the scheme progressed. That works out at 2.3 MW per turbine on average.
| Data | Source | Extract |
|---|---|---|
| Site, capacity, status, planning milestones | Renewable Energy Planning Database (DESNZ, Open Government Licence v3) | Q2 2026, published 03/08/2026 |
| Turbine positions | OpenStreetMap contributors (ODbL) | 19/08/2026 |
| Manufacturer and model | OpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong. | 19/08/2026 |
Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.