23 turbines · operational · Strathclyde
| Status | Operational |
|---|---|
| County / region | Strathclyde |
| Turbines | 23 |
| Installed capacity | 19.3 MW |
| Turbine capacity | 0.9 MW |
| Tip height | not recorded |
| Operator (or applicant) | RWE npower |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 5 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3298.
The application was determined in about 2 months. Construction to first power took about 38 months. A planning permission on this site expired in October 2012. The scheme has been operating for about 16 years. That works out at 0.84 MW per turbine on average.