🌬️ Onshore wind farm

ANP Newport Wind Turbine
Gwent

Recorded in WhichWindTurbine: 2 wind turbines in operation. Point the app at one of them to see its profile in real time.

2
turbines
2.3 MW
MW total
2.3 MW
per turbine
126 m
tip height

📍 2 turbines mapped — each dot is a turbine recorded in the database. Average position: 51.5573 N · 2.973 W.

ANP Newport Wind Turbine

2 turbines · operational · Gwent

Wind farm facts

StatusOperational
County / regionGwent
Turbines2
Installed capacity2.3 MW
Turbine capacity2.3 MW
Tip height126 m
Operator (or applicant)Associated British Ports
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~2039201620182020202220242026today1234
  1. 1Jul 2015 — Application submitted
  2. 2Sep 2015 — Permission granted
  3. 3Mar 2016 — Under construction
  4. 4Aug 2016 — Operational

The register also records a planning permission expiry in Sep 2018, after construction had started: an administrative date with no effect on the wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 1 year.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 5555.

What the register tells us

The application was determined in about 2 months. Construction to first power took about 5 months. A planning permission on this site expired in September 2018. The scheme has been operating for about 10 years. That works out at 1.15 MW per turbine on average.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.