3 turbines · operational · Western Isles
| Status | Operational |
|---|---|
| County / region | Western Isles |
| Turbines | 3 |
| Installed capacity | 3.9 MW |
| Turbine capacity | 1.3 MW |
| Tip height | not recorded |
| Operator (or applicant) | Arnish Electric Ltd / Farm Energy |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 5 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3306.
The application was determined in about 3 months. Construction to first power took about 0 month. A planning permission on this site expired in September 2005. The scheme has been operating for about 20 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 1.3 MW per turbine on average.