3 turbines · operational · Avon
| Status | Operational |
|---|---|
| County / region | Avon |
| Turbines | 3 |
| Installed capacity | 6 MW |
| Turbine capacity | 2 MW |
| Tip height | not recorded |
| Operator (or applicant) | Bristol Port Authority |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 2 years.
The register links a second scheme on this site (REPD ref 4159, Operational): 3 turbines · 3 MW each · applicant Bristol Port Company. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3194.
The application was determined in about 4 months. The scheme has been operating for about 19 years. That works out at 2 MW per turbine on average.