4 turbines · operational · Avon
| Status | Operational |
|---|---|
| County / region | Avon |
| Turbines | 4 |
| Installed capacity | 8.2 MW |
| Turbine capacity | 2.05 MW |
| Tip height | not recorded |
| Operator (or applicant) | Wessex Water Engineering Services |
| Turbine manufacturer | not recorded |
| Turbine model | Senvion MM92 |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 6 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3664.
The application was determined in about 3 months. Construction to first power took about 14 months. The scheme has been operating for about 12 years. That works out at 2.05 MW per turbine on average.