🌬️ Onshore wind farm

Bagmoor
Humberside

Recorded in WhichWindTurbine: 8 wind turbines in operation. Point the app at one of them to see its profile in real time.

8
turbines
16.0
MW total
2.00 MW
per turbine
n/a
rotor diameter

📍 8 turbines mapped — each dot is a turbine recorded in the database. Average position: 53.6273 N · 0.64255 W.

Wind farm facts

LocationHumberside
TypeOnshore wind
Number of turbines (database)8
ManufacturerData not available
ModelData not available
Rated power per turbine2.00 MW
Total capacity (database)16.0 MW
Rotor diameterData not available
Tip heightData not available
Commissioning year2009
StatusOperational
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

○ Cross-checked reference — turbine make and model (secondary source)

REpower (now Senvion) · MM92 · 8 turbines · 2 MW each

Source: Wikipedia, list of onshore wind farms in England (compiled from RenewableUK's UKWED and The Wind Power), read on 2026-09-19. This is a compiled list, not a primary record. It is shown because two independent facts — turbine count and rated power — match the database exactly. Awaiting confirmation from a primary source.

🇬🇧 Turbine model

The public sources do not record the turbine model for this wind farm. Only the number of turbines, their positions and the site capacity are available. Model information is missing for a large share of UK sites in the REPD.

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~203220052010201520202025today123
  1. 1Jan 2005 — Application submitted
  2. 2Apr 2006 — Permission granted
  3. 3Jul 2009 — Operational

The register also records a planning permission expiry in Apr 2000, in the same month as, or before, the permission was granted: it refers to an earlier permission, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

Operator (or applicant): Munich Re (previously Wind Prospect) · Turbines: 8 · Turbine capacity: 2 MW · Status: Operational

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2928.

Frequently asked questions

How many wind turbines does Bagmoor have?

The WhichWindTurbine database records 8 wind turbines in operation at this site, with a total capacity of about 16.0 MW (sources: REPD and OpenStreetMap).

What type of turbines does this wind farm use?

Neither the manufacturer nor the model is recorded in the public sources for this wind farm.

Where is Bagmoor located?

Area: Humberside. The average position of the wind farm is 53.6273 N / 0.64255 W.

How can I identify a turbine at this wind farm?

With the WhichWindTurbine web app: from an open viewpoint, point your phone at a turbine. The app combines your GPS position, compass and camera with its database to show the profile of the turbine you are looking at.

When was Bagmoor commissioned?

The commissioning year recorded in the database is 2009. Public data may differ slightly from the operator's official date.

When could this wind farm be repowered?

Based on a typical lifetime of ~22 years for an onshore wind farm, the repowering window would be around 2031. Indicative projection only — no operator decision is implied.

Data sources

Wind farm data: Renewable Energy Planning Database (REPD, Department for Energy Security and Net Zero — Open Government Licence) for site attributes, and © OpenStreetMap contributors (ODbL) for turbine positions, as integrated in WhichWindTurbine. "Data not available" means the public sources do not record that attribute for this site.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.