🌬️ Onshore wind farm

Baillie Wind Farm
Highland

Recorded in WhichWindTurbine: 21 wind turbines in operation. Point the app at one of them to see its profile in real time.

21
turbines
52.5 MW
MW total
2.5 MW
per turbine

📍 21 turbines mapped — each dot is a turbine recorded in the database. Average position: 58.56579 N · 3.67359 W.

Baillie Wind Farm

21 turbines · operational · Highland

Wind farm facts

StatusOperational
County / regionHighland
Turbines21
Installed capacity52.5 MW
Turbine capacity2.5 MW
Tip heightnot recorded
Operator (or applicant)Baillie Windfarm Ltd
Turbine manufacturerNordex
Turbine modelN90/2500
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

✓ Verified reference — turbine make and model

Nordex · N90/2500 · 21 turbines · 2.5 MW each · rotor 90 m

Source: GlobalData / Power Technology, wind farm profile, 2024, read on 2026-09-19. Corroborated by 3 further sources. Where OpenStreetMap tags differ, this record prevails.

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~203520052010201520202025today1234
  1. 1Jul 2004 — Application submitted
  2. 2Jan 2010 — Permission granted
  3. 3Jul 2011 — Under construction
  4. 4Mar 2013 — Operational

The register also records a planning permission expiry in Jan 2015, after construction had started: an administrative date with no effect on the wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 9 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4021.

What the register tells us

The application was determined in about 66 months. Construction to first power took about 20 months. A planning permission on this site expired in January 2015. The scheme has been operating for about 13 years. That works out at 2.5 MW per turbine on average.

Nearby

See all wind farms in Highland.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.