Barmoor South Wind Farm

6 turbines · operational · Northumberland

Wind farm facts

StatusOperational
County / regionNorthumberland
Turbines6
Installed capacity13.8 MW
Turbine capacity2.3 MW
Tip heightnot recorded
Operator (or applicant)EDF
Turbine manufacturerVestas
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Project timeline Application submitted November 2007 Refused December 2007 Permission granted January 2010 Granted on appeal January 2010 Permission expired January 2012 Under construction March 2014 Operational January 2015

From application to operation, this scheme took about 8 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4163.

What the register tells us

The application was determined in about 26 months. Construction to first power took about 10 months. The register records a refusal in December 2007 before the scheme progressed. Permission was ultimately granted on appeal in January 2010. A planning permission on this site expired in January 2012. The scheme has been operating for about 11 years. That works out at 2.3 MW per turbine on average.