14 turbines · operational · Strathclyde
| Status | Operational |
|---|---|
| County / region | Strathclyde |
| Turbines | 14 |
| Installed capacity | 7.8 MW |
| Turbine capacity | 0.55 MW |
| Tip height | not recorded |
| Operator (or applicant) | RWE npower |
| Turbine manufacturer | Bonus |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 2 years.
The register links a second scheme on this site (REPD ref 11843, Application Submitted): 7 turbines · 4.8 MW each · 149.9 m tip height · applicant Nadara Limited (Beaufort Wind Limited). Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3295.
The application was determined in about 15 months. A planning permission on this site expired in August 2017. The scheme has been operating for about 27 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 0.56 MW per turbine on average.