Recorded in WhichWindTurbine: 15 wind turbines in operation. Point the app at one of them to see its profile in real time.
📍 15 turbines mapped — each dot is a turbine recorded in the database. Average position: 55.28145 N · 4.30738 W.
15 turbines · operational · East Ayrshire
| Status | Operational |
|---|---|
| County / region | East Ayrshire |
| Turbines | 15 |
| Installed capacity | 67.1 MW |
| Turbine capacity | 4.5 MW |
| Tip height | 149.9 m |
| Operator (or applicant) | E.ON Renewables / Red Rock Power Limited |
| Turbine manufacturer | Vestas |
| Turbine model | V136-4.5 (13) and V117-4.2 (2) |
Vestas · V136-4.5 (13) and V117-4.2 (2) · 15 turbines · 4.5 MW each
Source: GlobalData / Power Technology, wind farm profile, 2024-11, read on 2026-09-14. Corroborated by 3 further sources. Where OpenStreetMap tags differ, this record prevails.
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
The register also records a planning permission expiry in Nov 2024, after construction had started: an administrative date with no effect on the wind farm, left off the axis.
DevelopmentConstructionOperationAhead (repowering horizon at 22 years)
From application to operation, this scheme took about 11 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3503.
The application was determined in about 34 months. Construction to first power took about 38 months. Permission was ultimately granted on appeal in September 2017. A planning permission on this site expired in November 2024. The scheme has been operating for about 1 year. That works out at 4.47 MW per turbine on average.
| Data | Source | Extract |
|---|---|---|
| Site, capacity, status, planning milestones | Renewable Energy Planning Database (DESNZ, Open Government Licence v3) | Q2 2026, published 03/08/2026 |
| Turbine positions | OpenStreetMap contributors (ODbL) | 19/08/2026 |
| Manufacturer and model | OpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong. | 19/08/2026 |
Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.