🌬️ Onshore wind farm

Bin Mountain
Co. Tyrone

Recorded in WhichWindTurbine: 6 wind turbines in operation. Point the app at one of them to see its profile in real time.

6
turbines
9 MW
MW total
1.5 MW
per turbine

📍 6 turbines mapped — each dot is a turbine recorded in the database. Average position: 54.63157 N · 7.61804 W.

Bin Mountain

6 turbines · operational · Co. Tyrone

Wind farm facts

StatusOperational
County / regionCo. Tyrone
Turbines6
Installed capacity9 MW
Turbine capacity1.5 MW
Tip heightnot recorded
Operator (or applicant)Greencoat UK Wind
Turbine manufacturerGE Wind Energy (secondary source)
Turbine model1.5s (secondary source)
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

○ Cross-checked reference — turbine make and model (secondary source)

GE Wind Energy · 1.5s · 6 turbines · 1.5 MW each

Source: Wikipedia, list of onshore wind farms in the United Kingdom (compiled from UKWED and The Wind Power), read on 2026-09-19. This is a compiled list, not a primary record. It is shown because two independent facts — turbine count and rated power — match the database exactly. Awaiting confirmation from a primary source.

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~202920052010201520202025today1234
  1. 1May 2001 — Application submitted
  2. 2Feb 2006 — Permission granted
  3. 3Dec 2006 — Under construction
  4. 4Feb 2007 — Operational

The register also records a planning permission expiry in Feb 2019, after construction had started: an administrative date with no effect on the wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 6 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3113.

What the register tells us

The application was determined in about 57 months. Construction to first power took about 2 months. A planning permission on this site expired in February 2019. The scheme has been operating for about 19 years. That works out at 1.5 MW per turbine on average.

Nearby

See all wind farms in Co. Tyrone.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.