Blaen Bowi Wind Farm

3 turbines · operational · Dyfed

Wind farm facts

StatusOperational
County / regionDyfed
Turbines3
Installed capacity3.9 MW
Turbine capacity1.3 MW
Tip heightnot recorded
Operator (or applicant)WINDJEN POWER LTD
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 Original scheme Application submitted June 2000 Permission granted January 2001 Operational July 2002 Later scheme Application submitted April 2005 Refused September 2007

From application to operation, this scheme took about 2 years.

The register links a second scheme on this site (REPD ref 3240, Appeal Refused): 3 turbines · 3 MW each · applicant Windjen Power Ltd / Dulas Ltd. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2630.

What the register tells us

The application was determined in about 7 months. The scheme has been operating for about 24 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 1.3 MW per turbine on average.