10 turbines · operational · Dyfed
| Status | Operational |
|---|---|
| County / region | Dyfed |
| Turbines | 10 |
| Installed capacity | 23 MW |
| Turbine capacity | 2.3 MW |
| Tip height | not recorded |
| Operator (or applicant) | Statkraft and Catamount Energy Corporation |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 3 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4670.
The application was determined in about 8 months. Construction to first power took about 12 months. A planning permission on this site expired in March 2007. The scheme has been operating for about 17 years. That works out at 2.3 MW per turbine on average.
See all wind farms in Dyfed.