Blantyre Muir Wind Farm extension

3 turbines · operational · Strathclyde

Wind farm facts

StatusOperational
County / regionStrathclyde
Turbines3
Installed capacity9 MW
Turbine capacity3 MW
Tip heightnot recorded
Operator (or applicant)Blantyre Muir Wind Energy Ltd�
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 Scheme REPD 3810 Application submitted August 2007 Permission granted November 2009 Operational December 2013 Permission expired November 2018 Scheme REPD 4240 Application submitted October 2010 Permission granted May 2012 Under construction June 2012 Operational January 2014

From application to operation, this scheme took about 6 years.

The register links a second scheme on this site (REPD ref 4240, Operational): 3 turbines · 2.5 MW each · applicant West Coast Energy. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3810.

What the register tells us

The application was determined in about 27 months. A planning permission on this site expired in November 2018. The scheme has been operating for about 13 years. That works out at 3 MW per turbine on average.

Nearby

See all wind farms in Strathclyde.