Recorded in WhichWindTurbine: 5 wind turbines in operation. Point the app at one of them to see its profile in real time.
📍 5 turbines mapped — each dot is a turbine recorded in the database. Average position: 52.5204 N · 0.04031 E.
| Location | Cambridgeshire |
|---|---|
| Type | Onshore wind |
| Number of turbines (database) | 5 |
| Manufacturer | Data not available |
| Model | Senvion MM92 |
| Rated power per turbine | 2.05 MW |
| Total capacity (database) | 10.3 MW |
| Rotor diameter | 92 m derived from model name |
| Tip height | 111 m |
| Commissioning year | 2015 |
| Status | Operational |
This wind farm uses the Senvion MM92 model. According to the WhichWindTurbine database, 9 Senvion MM92 turbines are recorded in operation in the UK (model information is not available for every turbine).
Application submitted 08/2009, consent granted 07/2011, construction started 07/2014, operational since 10/2015. 6 years from first application to first power. Indicative repowering window around 2037.
Application, consent, construction and commissioning dates are read from the Renewable Energy Planning Database, not estimated. Only the repowering horizon is a projection, based on a ~22-year lifetime, and it is the only hatched part of the chart.
The WhichWindTurbine database records 5 wind turbines in operation at this site, with a total capacity of about 10.3 MW (sources: REPD and OpenStreetMap).
Manufacturer: not recorded — model Senvion MM92. This information comes from the public data integrated in WhichWindTurbine.
Area: Cambridgeshire. The average position of the wind farm is 52.5204 N / 0.04031 E.
With the WhichWindTurbine web app: from an open viewpoint, point your phone at a turbine. The app combines your GPS position, compass and camera with its database to show the profile of the turbine you are looking at.
The commissioning year recorded in the database is 2015. Public data may differ slightly from the operator's official date.
Based on a typical lifetime of ~22 years for an onshore wind farm, the repowering window would be around 2037. Indicative projection only — no operator decision is implied.
Wind farm data: Renewable Energy Planning Database (REPD, Department for Energy Security and Net Zero — Open Government Licence) for site attributes, and © OpenStreetMap contributors (ODbL) for turbine positions, as integrated in WhichWindTurbine. "Data not available" means the public sources do not record that attribute for this site.