📍 10 turbines mapped — each dot is a turbine recorded in the database. Average position: 51.71043 N · 0.909 E.

Bradwell Wind Farm (Repower)

10 turbines · operational · Essex

Wind farm facts

StatusOperational
County / regionEssex
Turbines10
Installed capacity20 MW
Turbine capacity2 MW
Tip heightnot recorded
Operator (or applicant)Npower Renewables
Turbine manufacturerSenvion
Turbine modelMM82 (secondary source)
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

○ Cross-checked reference — turbine make and model (secondary source)

REpower (now Senvion) · MM82 · 10 turbines · 2 MW each

Source: Wikipedia, list of onshore wind farms in England (compiled from RenewableUK's UKWED and The Wind Power), read on 2026-09-19. This is a compiled list, not a primary record. It is shown because two independent facts — turbine count and rated power — match the database exactly. Awaiting confirmation from a primary source.

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20362010201520202025today12345
  1. 1Mar 2006 — Application submitted
  2. 2Jul 2006 — Permission granted
  3. 3Jul 2010 — Permission expired
  4. 4Apr 2012 — Under construction
  5. 5Sep 2013 — Operational

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 7 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3936.

What the register tells us

The application was determined in about 4 months. Construction to first power took about 17 months. A planning permission on this site expired in July 2010. The scheme has been operating for about 13 years. That works out at 2 MW per turbine on average.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.