3 turbines · operational · Gwynedd
| Status | Operational |
|---|---|
| County / region | Gwynedd |
| Turbines | 3 |
| Installed capacity | 3.9 MW |
| Turbine capacity | 1.3 MW |
| Tip height | not recorded |
| Operator (or applicant) | REG Windpower (previously Cornwall Light and Power) |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 3 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4022.
The application was determined in about 6 months. A planning permission on this site expired in September 2000. The scheme has been operating for about 19 years. That works out at 1.3 MW per turbine on average.