2 turbines · operational · Grampian
| Status | Operational |
|---|---|
| County / region | Grampian |
| Turbines | 2 |
| Installed capacity | 4.6 MW |
| Turbine capacity | 2.3 MW |
| Tip height | not recorded |
| Operator (or applicant) | Renewable Energy Ventures |
| Turbine manufacturer | Enercon |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 4 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4411.
The application was determined in about 15 months. Construction to first power took about 5 months. The register records a refusal in February 2014 before the scheme progressed. Permission was ultimately granted on appeal in July 2014. The scheme has been operating for about 9 years. That works out at 2.3 MW per turbine on average.
See all wind farms in Grampian.