Brownhill Farm

2 turbines · revised · Lanarkshire

Wind farm facts

StatusRevised
County / regionLanarkshire
Turbines2
Installed capacity8.4 MW
Turbine capacitynot recorded
Tip height139 m
Operator (or applicant)Wind Estate
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2017 2018 2019 2020 2021 2022 2023 2024 2025 Scheme REPD 6819 Application submitted November 2018 Permission expired August 2024 Scheme REPD 7991 Application submitted May 2020 Permission granted July 2020 Permission expired July 2023

The register links a second scheme on this site (REPD ref 7991, Under Construction): 2 turbines · 150 m tip height · applicant Wind Estate. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 6819.

What the register tells us

A planning permission on this site expired in August 2024. That works out at 4.2 MW per turbine on average.

Nearby

See all wind farms in Lanarkshire.