3 turbines · operational · Cambridgeshire
| Status | Operational |
|---|---|
| County / region | Cambridgeshire |
| Turbines | 3 |
| Installed capacity | 6 MW |
| Turbine capacity | 2 MW |
| Tip height | not recorded |
| Operator (or applicant) | Fivestone Ltd |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 4 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3686.
The application was determined in about 25 months. Construction to first power took about 5 months. The register records a refusal in January 2010 before the scheme progressed. Permission was ultimately granted on appeal in July 2011. A planning permission on this site expired in July 2010. The scheme has been operating for about 13 years. That works out at 2 MW per turbine on average.
See all wind farms in Cambridgeshire.