Carland Cross Wind Farm Repowering

15 turbines · decommissioned · Cornwall

Wind farm facts

StatusDecommissioned
County / regionCornwall
Turbines15
Installed capacity6 MW
Turbine capacity0.4 MW
Tip heightnot recorded
Operator (or applicant)Scottish Power Renewables
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

1990 1993 1996 1999 2002 2005 2008 2011 2014 Original scheme Application submitted May 1991 Permission granted April 1992 Operational August 1992 Later scheme Application submitted November 2008 Refused March 2009 Permission granted January 2010 Granted on appeal January 2010 Under construction January 2013 Operational October 2013

From application to operation, this scheme took about 1 year.

The register links a second scheme on this site (REPD ref 3976, Operational): 10 turbines · 2 MW each · applicant Scottish Power Renewables. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3005.

What the register tells us

The application was determined in about 11 months. The scheme has been operating for about 34 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 0.4 MW per turbine on average.