🌬️ Onshore wind farm

Carno 'B' Wind Farm
Powys · Powys

Recorded in WhichWindTurbine: 28 wind turbines in operation. Point the app at one of them to see its profile in real time.

28
turbines
16.8
MW total
0.6 MW
per turbine
n/a
rotor diameter

📍 28 turbines mapped — each dot is a turbine recorded in the database. Average position: 52.5493 N · 3.60719 W.

Wind farm facts

LocationPowys — Powys
TypeOnshore wind
Number of turbines (database)28
ManufacturerData not available
ModelData not available
Rated power per turbine0.6 MW
Total capacity (database)16.8 MW
Rotor diameterData not available
Tip heightData not available
Commissioning year1996
StatusOperational
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

~2019 reached1995200020052010201520202025today123
  1. 1Dec 1993 — Application submitted
  2. 2Aug 1995 — Permission granted
  3. 3Oct 1996 — Operational

The register also records a planning permission expiry in Aug 2010, after commissioning: an administrative date with no effect on the operating wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

Operator (or applicant): RWE npower · Turbines: 28 · Turbine capacity: 0.6 MW · Status: Operational

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2564.

Frequently asked questions

How many wind turbines does Carno 'B' Wind Farm have?

The WhichWindTurbine database records 28 wind turbines in operation at this site, with a total capacity of about 16.8 MW (sources: REPD and OpenStreetMap).

Where is Carno 'B' Wind Farm located?

Area: Powys — Powys. The average position of the wind farm is 52.5493 N / 3.60719 W.

How can I identify a turbine at this wind farm?

With the WhichWindTurbine web app: from an open viewpoint, point your phone at a turbine. The app combines your GPS position, compass and camera with its database to show the profile of the turbine you are looking at.

When was Carno 'B' Wind Farm commissioned?

The commissioning year recorded in the database is 1996. Public data may differ slightly from the operator's official date.

When could this wind farm be repowered?

Based on a typical lifetime of ~22 years for an onshore wind farm, the repowering window would be around 2018. Indicative projection only — no operator decision is implied.

Data sources

Wind farm data: Renewable Energy Planning Database (REPD, Department for Energy Security and Net Zero — Open Government Licence) for site attributes, and © OpenStreetMap contributors (ODbL) for turbine positions, as integrated in WhichWindTurbine. "Data not available" means the public sources do not record that attribute for this site.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.