4 turbines · operational · Derbyshire
| Status | Operational |
|---|---|
| County / region | Derbyshire |
| Turbines | 4 |
| Installed capacity | 8 MW |
| Turbine capacity | 2 MW |
| Tip height | not recorded |
| Operator (or applicant) | Carsington Wind Energy Limited |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 7 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4665.
The application was determined in about 20 months. Construction to first power took about 21 months. The register records a refusal in July 2007 before the scheme progressed. Permission was ultimately granted on appeal in September 2008. The scheme has been operating for about 12 years. That works out at 2 MW per turbine on average.