Recorded in WhichWindTurbine: 8 wind turbines Enercon in operation. Point the app at one of them to see its profile in real time.

8
turbines
16.0
MW total
2.00 MW
per turbine
70 m
rotor diameter

📍 8 turbines mapped — each dot is a turbine recorded in the database. Average position: 54.6513 N · 7.71770 W.

Wind farm facts

LocationCo. Tyrone
TypeOnshore wind
Number of turbines (database)8
ManufacturerEnercon
ModelE70
Rated power per turbine2.00 MW
Total capacity (database)16.0 MW
Rotor diameter70 m derived from model name
Tip heightData not available
Commissioning year2012
StatusOperational
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

🇬🇧 This model in the UK

This wind farm uses the E70 model. According to the WhichWindTurbine database, 27 E70 turbines are recorded in operation in the UK (model information is not available for every turbine).

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20342010201520202025today12345
  1. 1Apr 2005 — Application submitted
  2. 2Apr 2007 — Permission granted
  3. 3Apr 2011 — Permission expired
  4. 4May 2011 — Under construction
  5. 5Jun 2012 — Operational

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

Operator (or applicant): Greencoat (formerly Energia Renewables) · Turbines: 8 · Turbine capacity: 2 MW · Status: Operational

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4047.

Frequently asked questions

How many wind turbines does Church Hill have?

The WhichWindTurbine database records 8 wind turbines in operation at this site, with a total capacity of about 16.0 MW (sources: REPD and OpenStreetMap).

What type of turbines does this wind farm use?

Manufacturer: Enercon — model E70. This information comes from the public data integrated in WhichWindTurbine.

Where is Church Hill located?

Area: Co. Tyrone. The average position of the wind farm is 54.6513 N / 7.71770 W.

How can I identify a turbine at this wind farm?

With the WhichWindTurbine web app: from an open viewpoint, point your phone at a turbine. The app combines your GPS position, compass and camera with its database to show the profile of the turbine you are looking at.

When was Church Hill commissioned?

The commissioning year recorded in the database is 2012. Public data may differ slightly from the operator's official date.

When could this wind farm be repowered?

Based on a typical lifetime of ~22 years for an onshore wind farm, the repowering window would be around 2034. Indicative projection only — no operator decision is implied.

Data sources

Wind farm data: Renewable Energy Planning Database (REPD, Department for Energy Security and Net Zero — Open Government Licence) for site attributes, and © OpenStreetMap contributors (ODbL) for turbine positions, as integrated in WhichWindTurbine. "Data not available" means the public sources do not record that attribute for this site.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.