40 turbines · revised · Grampian

Wind farm facts

StatusRevised
County / regionGrampian
Turbines40
Installed capacity129 MW
Turbine capacitynot recorded
Tip heightnot recorded
Operator (or applicant)AMEC
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Original scheme Application submitted August 2003 Refused May 2006 Later scheme Application submitted June 2009 Permission granted December 2010 Permission expired December 2011 Under construction June 2013 Operational June 2015

The register links a second scheme on this site (REPD ref 4623, Operational): 18 turbines · 2.05 MW each · applicant Vattenfall. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3104.

What the register tells us

The register records a refusal in May 2006 before the scheme progressed. That works out at 3.23 MW per turbine on average.