Clochnahill Wind Farm

3 turbines · application refused · Grampian

Wind farm facts

StatusApplication Refused
County / regionGrampian
Turbines3
Installed capacity6 MW
Turbine capacity2 MW
Tip heightnot recorded
Operator (or applicant)Private Developer
Turbine manufacturerSiemens Gamesa
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 Scheme REPD 3265 Application submitted May 2006 Refused March 2007 Scheme REPD 2839 Application submitted July 2006 Permission granted August 2009 Operational January 2012 Permission expired August 2017

The register links a second scheme on this site (REPD ref 2839, Operational): 4 turbines · 1.3 MW each · applicant Private Developer. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3265.

What the register tells us

The register records a refusal in March 2007 before the scheme progressed. That works out at 2 MW per turbine on average.