🌬️ Onshore wind farm

Clyde Wind Farm Extension (Clyde 2)
Strathclyde · South Lanarkshire

Recorded in WhichWindTurbine: 54 wind turbines Siemens Gamesa in operation. Point the app at one of them to see its profile in real time.

54
turbines
172.8
MW total
3.2 MW
per turbine
n/a
rotor diameter

📍 54 turbines mapped — each dot is a turbine recorded in the database. Average position: 55.5055 N · 3.56181 W.

Wind farm facts

LocationStrathclyde — South Lanarkshire
TypeOnshore wind
Number of turbines (database)54
ManufacturerSiemens
ModelSWT-3.2-101
Rated power per turbine3.2 MW
Total capacity (database)172.8 MW
Rotor diameterData not available
Tip heightData not available
Commissioning year2017
StatusOperational
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

✓ Verified reference — turbine make and model

Siemens · SWT-3.2-101 · 54 turbines · 3.2 MW each · rotor 101 m

Source: Siemens, order press release (2015), 2015-10, read on 2026-09-14. Corroborated by 3 further sources. Where OpenStreetMap tags differ, this record prevails.

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~2040201520202025today1234
  1. 1Oct 2011 — Application submitted
  2. 2Jul 2014 — Permission granted
  3. 3Jul 2015 — Under construction
  4. 4Aug 2017 — Operational

The register also records a planning permission expiry in Jul 2011, in the same month as, or before, the permission was granted: it refers to an earlier permission, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

Operator (or applicant): Scottish and Southern Energy (SSE)/ GIB · Turbines: 54 · Turbine capacity: 3.2 MW · Status: Operational

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4178.

Frequently asked questions

How many wind turbines does Clyde Wind Farm Extension (Clyde 2) have?

The WhichWindTurbine database records 54 wind turbines in operation at this site, with a total capacity of about 172.8 MW (sources: REPD and OpenStreetMap).

Where is Clyde Wind Farm Extension (Clyde 2) located?

Area: Strathclyde — South Lanarkshire. The average position of the wind farm is 55.5055 N / 3.56181 W.

How can I identify a turbine at this wind farm?

With the WhichWindTurbine web app: from an open viewpoint, point your phone at a turbine. The app combines your GPS position, compass and camera with its database to show the profile of the turbine you are looking at.

When was Clyde Wind Farm Extension (Clyde 2) commissioned?

The commissioning year recorded in the database is 2017. Public data may differ slightly from the operator's official date.

When could this wind farm be repowered?

Based on a typical lifetime of ~22 years for an onshore wind farm, the repowering window would be around 2039. Indicative projection only — no operator decision is implied.

Data sources

Wind farm data: Renewable Energy Planning Database (REPD, Department for Energy Security and Net Zero — Open Government Licence) for site attributes, and © OpenStreetMap contributors (ODbL) for turbine positions, as integrated in WhichWindTurbine. "Data not available" means the public sources do not record that attribute for this site.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026