Common Barn Wind Farm

3 turbines · operational · Cambridgeshire

Wind farm facts

StatusOperational
County / regionCambridgeshire
Turbines3
Installed capacity6.2 MW
Turbine capacity3 MW
Tip heightnot recorded
Operator (or applicant)TCI Renewables
Turbine manufacturerSenvion
Turbine modelMM92

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Project timeline Application submitted May 2012 Refused December 2012 Permission granted July 2013 Granted on appeal July 2013 Permission expired July 2015 Under construction January 2018 Operational May 2019

From application to operation, this scheme took about 7 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4076.

What the register tells us

The application was determined in about 14 months. Construction to first power took about 16 months. The register records a refusal in December 2012 before the scheme progressed. Permission was ultimately granted on appeal in July 2013. A planning permission on this site expired in July 2015. The scheme has been operating for about 7 years. That works out at 2.07 MW per turbine on average.