Wind farm facts

StatusOperational
County / regionCo. Antrim
Turbines2
Installed capacity1.7 MW
Turbine capacity0.85 MW
Tip heightnot recorded
Operator (or applicant)Lowlands Health & Energy Ltd�
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 Original scheme Application submitted June 2008 Permission granted March 2012 Operational October 2012 Permission expired March 2017 Later scheme Application submitted January 2018

From application to operation, this scheme took about 4 years.

The register links a second scheme on this site (REPD ref 6572, Appeal Refused): 2 turbines · 0.8 MW each · 77 m tip height · applicant Connaught Wind. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3716.

What the register tells us

The application was determined in about 45 months. A planning permission on this site expired in March 2017. The scheme has been operating for about 14 years. That works out at 0.85 MW per turbine on average.