🌬️ Onshore wind farm

Connaught Road
Co. Antrim

Recorded in WhichWindTurbine: 2 wind turbines in operation. Point the app at one of them to see its profile in real time.

2
turbines
1.7 MW
MW total
0.85 MW
per turbine

📍 2 turbines mapped — each dot is a turbine recorded in the database. Average position: 54.76106 N · 6.34368 W.

Connaught Road

2 turbines · operational · Co. Antrim

Wind farm facts

StatusOperational
County / regionCo. Antrim
Turbines2
Installed capacity1.7 MW
Turbine capacity0.85 MW
Tip heightnot recorded
Operator (or applicant)Lowlands Health & Energy Ltd
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20352010201520202025today123
  1. 1Jun 2008 — Application submitted
  2. 2Mar 2012 — Permission granted
  3. 3Oct 2012 — Operational

The register also records a planning permission expiry in Mar 2017, after commissioning: an administrative date with no effect on the operating wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 4 years.

The register links a second scheme on this site (REPD ref 6572, Appeal Refused): 2 turbines · 0.8 MW each · 77 m tip height · applicant Connaught Wind. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3716.

What the register tells us

The application was determined in about 45 months. A planning permission on this site expired in March 2017. The scheme has been operating for about 14 years. That works out at 0.85 MW per turbine on average.

Nearby

See all wind farms in Co. Antrim.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.