Corkey Wind Farm

10 turbines · operational · Co. Antrim

Wind farm facts

StatusOperational
County / regionCo. Antrim
Turbines10
Installed capacity5 MW
Turbine capacity0.5 MW
Tip heightnot recorded
Operator (or applicant)B9 Energy Services Ltd/ ScottishPower Renewables
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

1992 1995 1998 2001 2004 2007 2010 2013 2016 Original scheme Application submitted November 1993 Permission granted June 1994 Operational December 1994 Later scheme Application submitted February 2010 Permission granted February 2012 Permission expired February 2017 Under construction April 2017 Operational July 2017

From application to operation, this scheme took about 1 year.

The register links a second scheme on this site (REPD ref 3852, Operational): 1 turbines · 2.5 MW each · applicant Northern Ireland Renewables. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3103.

What the register tells us

The application was determined in about 7 months. The scheme has been operating for about 32 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 0.5 MW per turbine on average.