Craig Wind Farm (Extension)

4 turbines · operational · Dumfries and Galloway

Wind farm facts

StatusOperational
County / regionDumfries and Galloway
Turbines4
Installed capacity10 MW
Turbine capacity2.5 MW
Tip heightnot recorded
Operator (or applicant)Craig Wind Farm Co
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2002 2004 2006 2008 2010 2012 2014 2016 2018 Original scheme Application submitted July 2003 Refused December 2003 Permission granted November 2004 Granted on appeal November 2004 Operational October 2007 Later scheme Application submitted August 2009 Permission granted February 2015 Under construction August 2016 Operational May 2017 Permission expired January 2018

From application to operation, this scheme took about 4 years.

The register links a second scheme on this site (REPD ref 4465, Operational): 1 turbines · 2.5 MW each · applicant Temporis Capital. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4524.

What the register tells us

The application was determined in about 16 months. The register records a refusal in December 2003 before the scheme progressed. Permission was ultimately granted on appeal in November 2004. The scheme has been operating for about 19 years. That works out at 2.5 MW per turbine on average.