3 turbines · operational · Cornwall
| Status | Operational |
|---|---|
| County / region | Cornwall |
| Turbines | 3 |
| Installed capacity | 2.4 MW |
| Turbine capacity | 0.8 MW |
| Tip height | not recorded |
| Operator (or applicant) | Crimp Power Ltd (West Coast Energy) |
| Turbine manufacturer | Enercon |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 7 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3458.
The application was determined in about 40 months. Construction to first power took about 8 months. The register records a refusal in April 2007 before the scheme progressed. Permission was ultimately granted on appeal in April 2008. The scheme has been operating for about 15 years. That works out at 0.8 MW per turbine on average.