10 turbines · operational · Dumfries and Galloway
| Status | Operational |
|---|---|
| County / region | Dumfries and Galloway |
| Turbines | 10 |
| Installed capacity | 48 MW |
| Turbine capacity | 4.8 MW |
| Tip height | 177 m |
| Operator (or applicant) | Muirhall Energy |
| Turbine manufacturer | Siemens Gamesa |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 3 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4633.
The application was determined in about 7 months. Construction to first power took about 22 months. A planning permission on this site expired in June 2018. The scheme has been operating for about 5 years. That works out at 4.8 MW per turbine on average.
See all wind farms in Dumfries and Galloway.