🌬️ Onshore wind farm

Curraghamulkin (Dooish Wind Farm)
Co. Tyrone

Recorded in WhichWindTurbine: 10 wind turbines in operation. Point the app at one of them to see its profile in real time.

10
turbines
30 MW
MW total
3 MW
per turbine
130 m
tip height

📍 10 turbines mapped — each dot is a turbine recorded in the database. Average position: 54.56435 N · 7.54578 W.

Curraghamulkin (Dooish Wind Farm)

10 turbines · operational · Co. Tyrone

Wind farm facts

StatusOperational
County / regionCo. Tyrone
Turbines10
Installed capacity30 MW
Turbine capacity3 MW
Tip height130 m
Operator (or applicant)DW Consultancy
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20402010201520202025today123456
  1. 1Mar 2008 — Application submitted
  2. 2Jan 2016 — Refused
  3. 3Nov 2017 — Permission granted
  4. 4Nov 2017 — Granted on appeal
  5. 5Jan 2018 — Under construction
  6. 6Jul 2018 — Operational

The register also records a planning permission expiry in Nov 2012, in the same month as, or before, the permission was granted: it refers to an earlier permission, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 10 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4151.

What the register tells us

The application was determined in about 116 months. Construction to first power took about 6 months. The register records a refusal in January 2016 before the scheme progressed. Permission was ultimately granted on appeal in November 2017. A planning permission on this site expired in November 2012. The scheme has been operating for about 8 years. That works out at 3 MW per turbine on average.

Nearby

See all wind farms in Co. Tyrone.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.