10 turbines · operational · Strathclyde
| Status | Operational |
|---|---|
| County / region | Strathclyde |
| Turbines | 10 |
| Installed capacity | 42 MW |
| Turbine capacity | 4.2 MW |
| Tip height | 149.9 m |
| Operator (or applicant) | Dalquhandy Wind Farm Limited |
| Turbine manufacturer | Nordex |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 11 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4189.
The application was determined in about 35 months. A planning permission on this site expired in January 2020. The scheme has been operating for about 3 years. That works out at 4.2 MW per turbine on average.