Delabole (Repowering)

10 turbines · decommissioned · Cornwall

Wind farm facts

StatusDecommissioned
County / regionCornwall
Turbines10
Installed capacity4 MW
Turbine capacity0.4 MW
Tip heightnot recorded
Operator (or applicant)Wind Electric
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 Original scheme Operational November 1991 Application submitted April 2008 Later scheme Application submitted April 2008 Permission granted December 2009 Under construction July 2010 Operational February 2011

The register links a second scheme on this site (REPD ref 3019, Operational): 4 turbines · 2.3 MW each · applicant Good Energy Generation. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2948.

What the register tells us

The scheme has been operating for about 35 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 0.4 MW per turbine on average.