Denzell Downs Wind Farm

5 turbines · revised · Cornwall

Wind farm facts

StatusRevised
County / regionCornwall
Turbines5
Installed capacity10 MW
Turbine capacity2 MW
Tip heightnot recorded
Operator (or applicant)REG Windpower
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 Scheme REPD 3736 Application submitted February 2011 Permission granted October 2011 Permission expired October 2018 Scheme REPD 4651 Application submitted June 2013 Permission granted December 2013 Under construction March 2015 Operational November 2015

The register links a second scheme on this site (REPD ref 4651, Operational): 5 turbines · 2 MW each · applicant REG Windpower / BlackRock. Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3736.

What the register tells us

The application was determined in about 8 months. A planning permission on this site expired in October 2018. That works out at 2 MW per turbine on average.