Recorded in WhichWindTurbine: 2 wind turbines in operation. Point the app at one of them to see its profile in real time.
📍 2 turbines mapped — each dot is a turbine recorded in the database. Average position: 57.57967 N · 2.60154 W.
2 turbines · operational · Aberdeenshire
| Status | Operational |
|---|---|
| County / region | Aberdeenshire |
| Turbines | 2 |
| Installed capacity | 4.7 MW |
| Turbine capacity | 2.35 MW |
| Tip height | 119 m |
| Operator (or applicant) | Blackfinch Energy |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
DevelopmentConstructionOperationAhead (repowering horizon at 22 years)
From application to operation, this scheme took about 5 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 7304.
The application was determined in about 7 months. A planning permission on this site expired in October 2022. The scheme has been operating for about 2 years. That works out at 2.35 MW per turbine on average.
| Data | Source | Extract |
|---|---|---|
| Site, capacity, status, planning milestones | Renewable Energy Planning Database (DESNZ, Open Government Licence v3) | Q2 2026, published 03/08/2026 |
| Turbine positions | OpenStreetMap contributors (ODbL) | 19/08/2026 |
| Manufacturer and model | OpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong. | 19/08/2026 |
Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.