13 turbines · operational · Lanarkshire
| Status | Operational |
|---|---|
| County / region | Lanarkshire |
| Turbines | 13 |
| Installed capacity | 45 MW |
| Turbine capacity | 4.2 MW |
| Tip height | 149.9 m |
| Operator (or applicant) | Greencoat (formerly 3R Energy/Blue Energy) / BayWa r.e |
| Turbine manufacturer | Vestas |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 8 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 5393.
The application was determined in about 7 months. Construction to first power took about 22 months. A planning permission on this site expired in February 2021. The scheme has been operating for about 3 years. That works out at 3.46 MW per turbine on average.
See all wind farms in Lanarkshire.