26 turbines · operational · Borders
| Status | Operational |
|---|---|
| County / region | Borders |
| Turbines | 26 |
| Installed capacity | 17.2 MW |
| Turbine capacity | 0.66 MW |
| Tip height | not recorded |
| Operator (or applicant) | Renewable Energy Systems (RES) |
| Turbine manufacturer | Vestas |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 4 years.
The register links a second scheme on this site (REPD ref 3579, Operational): 35 turbines · 0.85 MW each · applicant Renewable Energy Systems (RES). Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3570.
The application was determined in about 14 months. The scheme has been operating for about 26 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 0.66 MW per turbine on average.