🌬️ Onshore wind farm

Earlsburn North (Kingsburn) Wind Farm
Stirling

Recorded in WhichWindTurbine: 9 wind turbines in operation. Point the app at one of them to see its profile in real time.

9
turbines
22.5 MW
MW total
2.5 MW
per turbine

📍 9 turbines mapped — each dot is a turbine recorded in the database. Average position: 56.08548 N · 4.12397 W.

Earlsburn North (Kingsburn) Wind Farm

9 turbines · operational · Stirling

Wind farm facts

StatusOperational
County / regionStirling
Turbines9
Installed capacity22.5 MW
Turbine capacity2.5 MW
Tip heightnot recorded
Operator (or applicant)Falck Renewables
Turbine manufacturerNordex
Turbine modelN80/2500
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~20382010201520202025today1234
  1. 1Feb 2008 — Application submitted
  2. 2Apr 2010 — Permission granted
  3. 3Jun 2014 — Under construction
  4. 4May 2016 — Operational

The register also records a planning permission expiry in Apr 2018, after construction had started: an administrative date with no effect on the wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

From application to operation, this scheme took about 8 years.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4247.

What the register tells us

The application was determined in about 26 months. Construction to first power took about 23 months. A planning permission on this site expired in April 2018. The scheme has been operating for about 10 years. That works out at 2.5 MW per turbine on average.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.