6 turbines · operational · Grampian
| Status | Operational |
|---|---|
| County / region | Grampian |
| Turbines | 6 |
| Installed capacity | 18 MW |
| Turbine capacity | 3 MW |
| Tip height | not recorded |
| Operator (or applicant) | Vento Ludens |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 6 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 4072.
The application was determined in about 20 months. Construction to first power took about 13 months. The register records a refusal in December 2011 before the scheme progressed. Permission was ultimately granted on appeal in August 2012. A planning permission on this site expired in August 2011. The scheme has been operating for about 10 years. That works out at 3 MW per turbine on average.
See all wind farms in Grampian.