Elginny Hill

10 turbines · revised · Co. Antrim

Wind farm facts

StatusRevised
County / regionCo. Antrim
Turbines10
Installed capacity20 MW
Turbine capacity2 MW
Tip heightnot recorded
Operator (or applicant)Antrim Wind Energy
Turbine manufacturernot recorded
Turbine modelnot recorded

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Original scheme Application submitted September 2006 Later scheme Application submitted March 2011 Permission granted November 2014 Under construction March 2017 Operational March 2018 Permission expired November 2019

The register links a second scheme on this site (REPD ref 4563, Operational): 11 turbines · 2 MW each · applicant Brookfields (Antrim Wind Energy). Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2960.

What the register tells us

That works out at 2 MW per turbine on average.

Nearby