10 turbines · revised · Co. Antrim

Wind farm facts

StatusRevised
County / regionCo. Antrim
Turbines10
Installed capacity20 MW
Turbine capacity2 MW
Tip heightnot recorded
Operator (or applicant)Antrim Wind Energy
Turbine manufacturernot recorded
Turbine modelnot recorded
Open this wind farm in WhichWindTurbine Interactive map + augmented-reality identification on site

♻️ Project timeline

Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.

→ ~2040201520202025today1234
  1. 1Mar 2011 — Application submitted
  2. 2Nov 2014 — Permission granted
  3. 3Mar 2017 — Under construction
  4. 4Mar 2018 — Operational

The register also records a planning permission expiry in Nov 2019, after construction had started: an administrative date with no effect on the wind farm, left off the axis.

DevelopmentConstructionOperationAhead (repowering horizon at 22 years)

The register links a second scheme on this site (REPD ref 4563, Operational): 11 turbines · 2 MW each · applicant Brookfields (Antrim Wind Energy). Two schemes on one site usually mean a repowering or an extension — to be confirmed with the operator.

Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 2960.

What the register tells us

That works out at 2 MW per turbine on average.

Nearby

See all wind farms in Co. Antrim.

Sources and dates

DataSourceExtract
Site, capacity, status, planning milestonesRenewable Energy Planning Database (DESNZ, Open Government Licence v3)Q2 2026, published 03/08/2026
Turbine positionsOpenStreetMap contributors (ODbL)19/08/2026
Manufacturer and modelOpenStreetMap tags, unverified — REPD does not record turbine models. Known for 41 % of UK turbines (manufacturer) and 32 % (model); some values are propagated within a site and may be wrong.19/08/2026

Public data may lag behind operator figures. Spotted an error? Suggest a correction from the app.