10 turbines · operational · Co. Antrim
| Status | Operational |
|---|---|
| County / region | Co. Antrim |
| Turbines | 10 |
| Installed capacity | 5 MW |
| Turbine capacity | 0.5 MW |
| Tip height | not recorded |
| Operator (or applicant) | B9 Energy Services Ltd/ ScottishPower Renewables |
| Turbine manufacturer | not recorded |
| Turbine model | not recorded |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 2 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3106.
The application was determined in about 11 months. The scheme has been operating for about 31 years. At that age, wind farms commonly become candidates for repowering or life extension — nothing in the register confirms such a plan here. That works out at 0.5 MW per turbine on average.
See all wind farms in Co. Antrim.