15 turbines · operational · Strathclyde
| Status | Operational |
|---|---|
| County / region | Strathclyde |
| Turbines | 15 |
| Installed capacity | 70 MW |
| Turbine capacity | 4.6 MW |
| Tip height | 14.99 m |
| Operator (or applicant) | E.ON Renewables |
| Turbine manufacturer | Nordex |
| Turbine model | V133 |
Dated milestones from the UK Renewable Energy Planning Database (REPD), Q2 2026 — not estimates.
From application to operation, this scheme took about 11 years.
Source: Renewable Energy Planning Database, Department for Energy Security and Net Zero, Open Government Licence v3.0. REPD ref 3502.
The application was determined in about 48 months. Construction to first power took about 30 months. Permission was ultimately granted on appeal in September 2019. A planning permission on this site expired in September 2025. The scheme has been operating for about 0 year. That works out at 4.67 MW per turbine on average.